UAH Archives, Special Collections, and Digital Initiatives

Browse Items (8239 total)

  • "Saturn technical information handbook.  Volume III of four volumes : SA-203."

    The "Saturn Technical Information Handbook" provides up-to-date reference material to the Launch Operations Center personnel. This material shows the assembly and operation of the Saturn Vehicle components for systems analysis.; Volume II is available on the NASA Technical Reports Server (NTRS) as a PDF.
  • "Saturn IB inflight photographic instrumentation system."

    This Internal Note presents the development of the Saturn inflight photographic instrumentation program from its original development requirement concept to the flight hardware application on Saturn vehicles. A comprehensive description of the infight photographic instrumentation system is given along with data concerning testing, operation, application, and evaluation of the system after recovery. This Internal Note shows that the system has been successfully developed,that valuable information has been obtained from film retrieved from recovered capsules, and that the system can be used with a high degree of reliability.
  • "Saturn S-II stage program plan."

    This documents outlines the S & ID plan to fulfill the requirements of Contracts NAS7-80 and NAS7-200 for the design, development and manufacture of the Saturn S-II stage.; APPROVED by R E. Greer, Vice President and S-II Program Manager.; This reissue supersedes all previous issues of this report.; FOREWORD: The S-II stage is 81.5 feet in length and 33 feet in diameter, with a usable propellant capacity of 970,000 pounds, The S-II propellants are fully cryogenic-liquid oxygen at -279 F and liquid hydrogen at -423 F. Its five-engine cluster provides one million pounds of thrust. The stage is a cylindrical structure of relatively light weight with a shell designed to resist all loads without the use of stiffening members. Its skin is of welded aluminum panels, as are the elliptical bulkheads of the fuel and oxidizer tanks. Unique to its design is the common bulkhead that separates the -423 F liquid hydrogen from the -247 F liquid oxygen. The common bulkhead - a sandwich of two 33-foot diameter aluminum domes separated by an insulating filler of honeycomb - eliminates the weight penalty that would be imposed by the second bulkhead in more conventional design. This document describes the S & ID program plan for development of the S-II stage and associated a support equipment.
  • "Saturn S-II annual progress report 1 July 1963 through 30 June 1964."

    This document is the second annual progress report of the Saturn S-II Program. The report provides a summary and technical analysis of results of contract work by the Space and Information Systems Division of North American Aviation, Inc., for the period 1 July 1963 through 30 June 1964. This document was prepared in compliance with NASA contract NAS7-200.
  • "Saturn S-II : annual progress report : 1 July 1962 through 30 June 1963."

    This document, prepared in compliance with NASA contract NAS7-200, is the first annual progress report on the Saturn S-11 Program at the Space and Information Systems Division of North American Aviation, Inc. It provides a summary- and a technical analysis of results of contract work for the period 1 July 1962 through 30 June 1963.; SID 63-1028-1 251 pages. Include illustrations.
  • Saturn V project development plan : November 1967.

    This document revises and supersedes the Saturn V Project Development Plan, dated March, 1967. Approved: Arthur Rudolph, Manager, Saturn V Program; Samuel C. Phillips, Major General, USAF, Director, Apollo Program.
  • Saturn V management information : August 1964 : Volume VI.

    This document contains copies of management charts maintained in the Managerial Data Center of the executive Staff on the Saturn V project. To facilitate use of this document, all Saturn V classified data has been removed and will be published in Volume XI. A list of these charts are shown on the "Table of Contents". Information on other MSFC activities will be published in separate volumes as indicated on the "Schedule for Publication of Data Bank Charts" contained in this volume.
  • "Saturn system study II."

    Study regarding the three-stage carrier vehicle E-1 engines.
  • "Space Station operations analysis using Gemini-Titan II-Agena."
  • Spaceflight: DDC report bibliography.

    Bibliography containing space crews, space flights, satilites, cryogenic propellants, propaganda and the USSR.
  • Space age vision [photograph].

    8 x 10 inch black and white photograph.
  • Source credibility and personal influence in three contexts : a study of dyadic communication in a complex aerospace organization.

    Abstract to "A thesis submitted to the faculty of Purdue University fo Gary Marshall Richetto in partial fulfillment of the requirements for the degree of Doctor of Philosophy, January 1969".; Handwritten note on front page: Return to Internal Communication, Room 223, 4202.
  • "Statement of George E. Mueller, Associate Administrator for Manned Space Flight."

    Volume I - Text. A statement given by George E. Mueller to the Committee of Aeronautical and Space Sciences.
  • "University and research institute contracts awarded by MSFC."

    This is a list of contract numbers, contractor, subject and RNT contact.
  • "United Aircraft Quarterly Bee-hive:"  Spring, 1962:  Volume XXXVII, Number 2.

    A book containing various articles surrounding the activities and achievements of the Saturn program up to Spring, 1962.
  • "United Aircraft Quarterly Bee-hive:"  January 1962, Volume XXXVII, Number 1.

    A book containing various articles surrounding the activities and achievements of the Saturn program up to January, 1962.
  • A "Think Clean" training program.

    This paper outlines steps involved in preparing and presenting an instruction course on clean rooms. The training area, personnel, equipment, and program outline will be described. A summary of the results obtained over the first year of operation will be presented.
  • Various organization charts of NASA-MSFC during 1960-1969.

    A collection of organization charts from years 1960 to 1969.
  • "Crew Briefing : Instrument Unit Stage Presentation".

    Document outlining different slides of a presentation containing numerous organizational charts, diagrams and bullet-list points.
  • "Countdown to Liftoff".

    This is an article from the Boeing Magazine. The Archive copy is a very poor photocopy and is difficult to read.; About the time the S-IC-1 booster is lifting the first Apollo/Saturn V from the launch pad on its maiden unmanned flight next year, a Boeing systems test crew will begin static testing the S-IC-4 at Devils Swamp, Mississippi (MTF). Starting with S-IC-4, all Saturn V first stage boosters will be captive fired at MTF. At present, S-IC firings are conducted by MSFC's test laboratory at Huntsville. The first flight stage, the S-IC-1, was placed in the static test stand on 24 January 1966 and completed its test program 25 Feb. It was removed from the stand March 14 and is undergoing post-firing checkout. it is due to be shipped this summer to KSC where it will be mated to the two upper stages of Saturn V, the IU and Dummy Apollo payload. The S-IC-2 went into the static stand on March 22 and is being tested during April The S-IC-3 also will be tested at Huntsville in 1966. The job of putting the world's largest and most powerful rocket together will be accomplished in the world's largest building, the 52-story vehicle assembly building.