"America's Spaceport."
Guide to John F. Kennedy Space Center, including an introduction from Center director Kurt Debus. -
"American Progress and Goals in Space," address by James E. Webb.
This address was given by James E. Webb, Administrator, National Aeronautics and Space Administration, at the Inventors' Congress and Space Symposium, Little Rock, Arkansas. -
"An Iterative Guidance Scheme and Its Application to Lunar Landing."
A guidance scheme for vehicle flight from lunar orbit to a prescribed point on a spherical, non-rotating moon is presented. The equations of motion have been simplified only to perm it a closed solution for the thrust magnitude and thrust direction. The trajectory computations them selves are made under more realistic and accurate assumptions and are not included. -
"Analog Simulation of Saturn S-IB Stage Propulsion System Dynamic Characteristics."
This copy has handwritten notes that change the title to read, "Analog Simulation of Uprated Saturn I Stage Propulsion System Dynamic Characteristics." The abstract notes, "The purpose of this paper is to present the techniques and logic employed in the development of an analog computer model to simulate Saturn IV first stage propulsion system dynamic characteristics. Restraints, problem areas, and major assumptions are included." -
"Annual progress report :1966-1967."
The Annual Progress Report from July 1st, 1966 through June 30thm 1967. -
"Apollo - LEM Docking Drogue Assembly Static Structural Test."
This document contains the tests and test results from structural tests performed on the Apollo LEM docking drogue assembly between January 11, 1967 and February 15, 1967. The document contains various graphs, diagrams, and images pertaining to the tests. -
"Apollo 10 crew ready for return from space."
News article detailing the Apollo 10 crew's preparations to return to Earth from lunar orbit. -
"Apollo 10 in spotlight as CDDT is completed."
News article detailing the attention Apollo 10 is getting after its successful countdown demonstration test (CDDT). -
"Apollo 10 to simulate lunar landing mission."
A news article describing that Apollo 10's goal is to simulate a lunar landing in preparation for the real mission. -
"Apollo 11 module comes back to downey home."
A news article detailing the return of the Apollo 11 module to Downey and the plans to set it up as a display. -
"Apollo 4 Pre-Launch Press Conference."
This document contains a transcription of the pre-launch press conference for Apollo 4. It includes the questions asked and answers given by participants Dr. Robert C. Seamans, Dr. George E. Mueller, Major General Samuel C. Phillips, Dr. Kurt H. Debus, and Dr. Wernher von Braun. -
"Apollo 4 press kit."
The flrst flight test of the Apollo/Saturn V space vehicle is scheduled for launch from the Natlonal Aeronautics and Space Administration's John F, Kennedy Space Center, Fla., no earlier than Nov. 7. The mission is designated Apollo 4. -
"Apollo 5 Post-Launch Press Conference."
This document contains the transcription from the Apollo 5 post-launch press conference, including all the questions asked and answers given by participants Major General Samuel C. Phillips, Rocco A. Petrone, and Colonel William Teir. -
"Apollo 5 Pre-Launch Press Conference."
This document contains a transcript of the pre-launch conference, including the questions asked and the answers given by participants William C. Schneider, Rocco A. Petrone, George M. Low, Col. William Teir, Col. Royce Olson, Christopher C. Kraft, Jr., and Eugene F. Kranz. -
"Apollo 6 Pre-Launch Press Conference."
The press conference was given at Cape Royal News Center in Cocoa Beach, Florida, on Wednesday, April 3, 1968, at 3:30 PM. Participants: William C. Schneider, Apollo Mission Director, NASA; George M. Low, Apollo Spacecraft Manager, NASA; Clifford Charlesworth, Apollo 6 Flight Director, Manned Spacecraft Center, NASA; Dr. Arthur Rudolph, Saturn V Program Office, Marshall Space Flight Center, NASA; Rocco A. Petrone, Apollo 6 Launch Director, Kennedy Space Center, NASA; Col. Royce Olson, USAF, Director DOD Manned Spaceflight Support Office, Patrick AFB; Chris Kraft, Director of Flight Operations, Manned Spacecraft Center. -
"Apollo 7 Mission Commentary."
This document contains the transcript from the Apollo 7 mission. This transcript contains the communication from the first seven days of the ten day mission.