  • "Key Events in the Manned Lunar Landing Program."
  • "Key MSFC Personnel for Potential Interview Efforts."

    Essay detailing potential candidates for potential interviews.
  • "KSC Apollo/Saturn V Master Test Plan."

    The John F. Kennedy Space Center (KSC) Apollo/Saturn V Development/Operations Plan, K-PM-0, establislies the requirement for an Apollo/Saturn V Master Test Plan (MBP). This document, prepared by the Saturn Systems Office.
  • "Launch Complex 34 Facilities Fact Sheet 05."

    Article detailing the different aspects of the Launch Complex 34 facilities.
  • "Launch Complex 37 Facilities Fact Sheet."

    Article detailing the different aspects of the Launch Complex 34 facilities.
  • "Launch Complex 39 Facilities Fact Sheet 03."

    Article detailing the different aspects of the Launch Complex 34 facilities.
  • "Launch Control and Checkout Equipment (LCCE) [photograph]."

    Description of an 8 x 10 inch black and white photograph.
  • "Launch Information: Saturn S-IV and the RL10 Engine."

    The RL10, which powers the National Aeronautics and Space Administration' s Saturn S-IV, is the newest propulsion system to be put to work in advancing our nation's space effortr On November 27, 1963, a pair of RLlO's successfully powered a five-ton Centaur space vehicle in earth orbit in the first flight demonstration of the outer space powerplant which uses high-nenergy liquid hydrogen as fuel. A six-engine cluster of RLlO' s, generating a total of 90, 000 pounds of thrust, powers the Saturn S-IV stage. The 15, 000 pound-thrust engine was designed and developed for NASA's Mar shall Space Flight Center at Pratt & Whitney Aircraft's Florida Research and Development Center, 20 miles northwest of West Palm Beach.
  • "Launch Vehicle Engines Project Development Plan."

    This revised edition of the Launch Vehicle Engines Project Development Plan supersedes the issue dated July 1, 1965. Significant changes which have been made are:- Removal of classified data to permit publication as an unclassified document; - Removal of material applicable to the RL-10 Engine Project which was transferred to the Lewis Research Center effective May 1, 1966; - Elimination of detailed schedules which quickly become obsolete; - Punched for maintenance in loose-leaf 3-ring binders and for ease in updating material through issuance of replacement sheets. Binders are not furnished. The information in this document is current to January 1, 1967.; The Launch Vehicle Engines Project Development Plan is established in accordance with requirements of NASA General Management Instruction 4-1-1, Planning and Implementation of NASA Projects, and OMSF Instruction MP 9320.044, Preparation and Revision of Program/Project Development Plans (PDP's). The Plan, herein referred to as the PDP, has been developed within the scope of current Apollo Projects Approval Documents (PADS) and will be maintained by the Engine Program Manager to identify program requirements, responsibilities, tasks, and resources, and time phasing of major actions required to accomplish the Engine Program.
  • "Launch Vehicle Recovery System Requirements."

    The primary considerations in the design and development of a recovery system applicable to present expendable first stage launch vehicles are discussed. The general requirements that define the essential characteristics of a feasible recovery system are derived from three critical phases during flight. The degree of criticalness is primarily influenced by the conditions at stage cutoff and separation. The three critical phses of flight are broken down into the following: (1) conditions and requirements between stage separation to re-entry; (2) re-entry; and (3) terminal descent and landing.
  • "Launch Vehicle Engines Project Development Plan."

    The primary mission objective of the 5-2 Engine Project is to continue development of a liquid oxygen/liquid hydrogen engine. capable of high-altitude restart. Both Saturn IB and Saturn V vehicles will use the J-2 engine; the S-IVB stage of Saturn IB vehicles and S-IVB stage of Saturn V vehicles will be equipped with a single J-2 engine. The S-I1 stage of Saturn V vehicles will use a cluster of five J-2 engines. Figure 1-3 illustrates these stages.
  • Letter to Mr. Frank L. Murphy.

    Letter to Frank L. Murphy from David L. Christensen informing of an awarded contract. Also requests documents.
  • Letter to Mr. J. L. Atwood.

    Letter to J. L. Atwood from George M. Mueller regarding the S-II stage.
  • Letter to Dr. Hugh Odishaw.

    Letter to Hugh Odishaw from Donald Hornig regarding a previous meeting as well as an F-1 engine report.
  • Letter to Dr. Wernher von Braun.

    Letter to Wernher von Braun from D. Brainerd Holmes. Contains C-5 definitive contract schedules.
  • "History of Rocket Development Division."

    A document recounting the history of the Rocketdyne Development Division
  • "Historical Summary: S & ID Apollo Program."

    Four and a half years have passed since President Kennedy and the United States Congress established a national goal of landing a man on the moon, before the end of the decade. This brief history is designed to be a working tool for use during the second half of this great adventure. It is expected that by presenting the events of the past in perspective this document will become a handy reference to accomplishments of the first half of the program. It is hoped that this volume will be of value to those directly and indirectly concerned with North American's portion of the Apollo program. This history contains a chronology of significant events, as well as material on the management of the program, a record of some of the breakthroughs in technology, a report of the hardware produced to date, and the many tests performed to man-rate the equipment.
  • "Historical Summary on the Von Braun Missile Team."
  • "Huntsville: Space City, U.S.A."

    An article describing Huntsville's role in various space related projects.
  • "Human Factor: ATM /Skylab."

    Statement of work: Man/Machine activities -ATM; ATM problem areas; EVA commuting problem; Other EVA considerations; Analysis of crew considerations Mission 211/212; Mission objectives Crew Considerations; Mission Fight Profile & Operations Crew Considerations; Experiment operations crew considerations; EVA equipment requirements; Crew considerations carrier recommendations; Conclusions and recommendations crew considerations; Crew operations requirements preliminary 10 August 1996; ATM stabilization and control; ATM Carrier habitability and profile; Other ATM man/machine considerations.; Original is a poor photocopy.; Document has no page numbering.